Housing Society Solar

Solar Power for Housing Societies and Apartment Complexes

Reduce the common-area electricity bill shared by every resident — lifts, corridor lighting, water pumps and clubhouse loads — with a shared rooftop solar system.

Shared rooftop, shared savings
RWA-friendly process
Lower common area maintenance
Apartment building complex with solar panels installed on the shared rooftop
Overview

Shared Rooftops, Shared Savings

Housing societies and apartment complexes carry a significant common-area electricity bill covering lifts, corridor and staircase lighting, common water pumps, security systems, and clubhouse facilities — a cost that gets divided among all residents through maintenance charges. A shared rooftop solar system installed on the society's terrace can directly offset this common-load electricity connection, reducing the burden on the maintenance budget over time. Because the decision affects the whole community, housing society projects typically involve resident awareness sessions and formal approval from the RWA or managing committee before installation begins.

Who is this solution suitable for?

Group housing societies with a shared terraceApartment complexes with a dedicated common-area meterRWAs looking to reduce monthly maintenance chargesGated communities with clubhouse or amenity loadsSocieties planning EV charging for residents

Key Benefits

Lower Common Charges

Reduced common-area electricity spend benefits every resident.

Community-Wide Impact

One installation delivers savings across the entire society.

Predictable Long-Term Costs

Reduces exposure to future electricity tariff increases for common loads.

Visible Sustainability Step

A tangible green initiative residents can see and support.

How the System Works

  1. 1 Panels installed on the society's shared terrace generate DC power through the day.
  2. 2 The inverter converts this to AC power connected to the society's common-area electricity meter.
  3. 3 Lifts, corridor lighting, common water pumps and clubhouse loads draw solar power first during daylight hours.
  4. 4 Any surplus, where net metering is approved for the common connection, is exported to the grid.

Get a Free Site Assessment

Tell us about your property and our team will call you back.

System Sizing

Available System Capacity

Indicative starting points — final sizing depends on your actual consumption and rooftop or land area.

System CapacityTypically Suitable ForApprox. Area RequiredIndicative Monthly Generation
10 kW – 20 kWSmall societies (2–3 towers)900 – 1,800 sq. ft1,200 – 2,400 units/month
20 kW – 50 kWMid-size gated communities1,800 – 4,500 sq. ft2,400 – 6,000 units/month
50 kW – 100 kWLarge townships with multiple common meters4,500 – 9,000 sq. ft6,000 – 12,000 units/month
100 kW+Large integrated townshipsAs per site surveyAs per system design
Components

What Goes Into the System

Every installation is built from certified, compatible components sized for your load.

Solar Panels

High-efficiency modules laid out to maximise shared terrace utilisation.

Grid-Tied Inverter

Sized for the society's common-area connection capacity.

Terrace Mounting Structure

Engineered to avoid interference with water tanks, lift rooms or common utilities.

Balance of System

Cabling and protection routed to minimise impact on terrace usability.

Society Monitoring Dashboard

A shared view of generation and savings the managing committee can track.

Net Meter

Connected to the society's designated common-area meter.

Our Process

Suggested Installation Process

A clear, transparent path from enquiry to handover.

STEP 01

Resident Awareness Session

We present the proposal, costs and expected savings to the RWA/committee.

STEP 02

Committee Approval & Site Survey

Formal approval followed by a terrace and structural assessment.

STEP 03

System Design & Quote

Sizing based on the society's actual common-area consumption.

STEP 04

Documentation

Support with connection and net-metering paperwork for the common meter.

STEP 05

Installation

Scheduled to minimise disruption to terrace access and society activities.

STEP 06

Testing, Handover & Reporting

Commissioning plus a shared monitoring dashboard for the committee.

Pricing

What Affects Your Project Cost

  • System capacity relative to the society's common-area sanctioned load
  • Terrace layout constraints — water tanks, lift machine rooms, existing utilities
  • Cabling distance from the terrace to the common-area meter/DB
  • Approval and documentation complexity for society-owned connections
  • Whether a phased rollout across multiple towers is required
Savings

Estimated Savings Potential

Because common-area loads like lifts, pumps and corridor lighting run consistently through the day, they align reasonably well with solar generation hours, helping reduce the collective electricity spend that is otherwise divided across all residents' maintenance bills.

Use our interactive calculator on the homepage for an indicative estimate based on your own electricity bill and rooftop area.

Calculate Your Savings
Subsidy

Subsidy Applicability

Group housing societies (GHS) are recognised as a distinct eligible category under the central rooftop solar subsidy scheme in many cases, often with subsidy calculated per residential unit within the society, subject to current scheme rules and caps. We help the managing committee understand and pursue this during the proposal stage.

View Full Subsidy Guide
Finance

Finance Options

Societies can explore society-level loans, resident co-funding models, or in some cases individual resident financing tied to the shared installation — the right structure depends on the society's bylaws and financial setup, best discussed with your managing committee and our team together.

Explore EMI & Finance
Upkeep

Maintenance Requirements

A structured AMC is especially useful for housing societies, since terrace access and cleaning schedules need to be coordinated with facility management — we recommend a maintenance plan that aligns with the society's existing housekeeping routine.

Solar Maintenance Plans
Reference Projects

Illustrative Project Examples

Representative examples of the scale and outcomes this solution supports.

Gomti Nagar Extension, Lucknow

25 kW Society Common Area System

25 kW / On-Grid

A 120-flat gated community offset lift and corridor lighting load with a shared terrace installation.

Aliganj, Lucknow

15 kW Apartment Complex System

15 kW / On-Grid

A mid-size society reduced its common water pump and security lighting electricity spend.

Vrindavan Yojna, Lucknow

40 kW Multi-Tower Township

40 kW / On-Grid

A multi-tower township phased installation across two terraces to cover all common loads.

Why Choose Us

Why Choose Sarth Solar for Housing Society Solar

RWA-Friendly Process

We present clearly to committees and residents, not just individual buyers.

GHS Subsidy Guidance

Support navigating group housing society subsidy category rules.

Terrace-Aware Design

Layouts planned around existing water tanks, lift rooms and utilities.

Certified Installation

Safety practices suited to shared, high-footfall terrace areas.

Coordinated AMC Scheduling

Maintenance visits planned with your facility management team.

Transparent Society-Level Pricing

Clear cost breakdown suitable for committee review and approval.

FAQs

Housing Society Solar — Frequently Asked Questions

Typically the society/RWA owns the common-area installation, since it offsets the shared common-area meter — this is confirmed during the proposal and agreement stage.

Approval processes vary by society bylaws; generally, formal sign-off from the managing committee or a resident vote is required before installation begins.

A common-area installation is designed to offset the society's shared meter (lifts, lighting, pumps), not individual flat connections, which have separate meters.

Many housing societies fall under a distinct Group Housing Society (GHS) category in the central subsidy scheme, subject to current rules — we help the committee evaluate this.

Our design process works around existing water tanks, lift machine rooms, and other terrace utilities rather than requiring their relocation wherever possible.

This is typically defined in the installation agreement — many societies opt for an ongoing AMC with our team coordinated through facility management.

Where terrace area and sanctioned load allow, future phases can often be added — best planned during the initial proposal discussion.

This varies based on committee decision-making timelines and DISCOM processes; our team supports documentation to help keep things on track.

The system is designed to integrate with your existing common-area connection; any required panel upgrades are identified during the site survey.

Enquire About Housing Society Solar

Fill in your details — our team typically responds within one business day.

Bring Solar Savings to Your Entire Society

Request a proposal your RWA or managing committee can review and approve.

Call WhatsApp Get Quote